Title
Consider recommendations regarding Amendment No. 2 with Endelos Energy, Inc. for the Betteravia Campus and Fire Station 12 Renewable Energy Project No. 19026, Second and Fifth Districts, as follows: (4/5 Vote Required)
a) Approve and authorize the Chair to execute Amendment No. 2 to the Contract (BC19490) with Endelos Energy, Inc. increasing the Maximum Compensation Limit (MCL) of $4,499,743.49 by $983,340.04, for a MCL of $5,483,083.40 and modifying the Contract end date from September 29, 2022 to September 29, 2023 for the Santa Barbara County Betteravia Campus and Fire Station 12 Renewable Energy Project No. 19026;
b) Approve Budget Revision Request No. 000544; and
c) Determine that the renewable energy project is statutorily exempt from the provisions of the California Environmental Quality Act (CEQA) pursuant to California Public Resources Code Section 21080.35 (installing solar systems on existing roofs and existing parking lots), and it is further categorically exempt from the provisions of CEQA per sections 15301 (minor alterations to existing facilities) and 15303 (limited construction of small facilities) and 15304 (minor alterations of land) of Title 14 of the California Code of Regulations and a Notice of Exemption was filed on that basis, and that the recommended actions are within the scope of that Notice of Exemption.