File #: 24-00067    Version: 1
Type: Administrative Item Status: Agenda Ready
File created: 1/12/2024 In control: BOARD OF SUPERVISORS
On agenda: 1/23/2024 Final action: 1/23/2024
Title: Consider recommendations regarding the Calle Real Campus Main Water Loop Design Award of the Professional Services Agreement (PSA) for Construction Administration Services, Project No. 19012, Second District, as follows: a) Approve and authorize the Chair to execute the PSA with Diversified Project Services International, Inc. (DPSI) to provide professional civil design, and construction administration services for the Calle Real Campus Main Water Loop Improvements and New Water Loop Design, located on the County's Calle Real Campus in Santa Barbara, CA, in an amount not to exceed $29,490.00; and b) Find that this contract is determined by your Board to be exempt from the provisions of the California Environmental Quality Act (CEQA) under State CEQA Guidelines Section 14 CCR 15302(c) because it consists of replacement or reconstruction of existing utility systems and/or structures where the new structure will be located on the same site as the structure replaced and will have substan...
Sponsors: GENERAL SERVICES DEPARTMENT
Attachments: 1. Board Letter, 2. Attachment 1_DPSI_PSA_19012-2 Calle Real Water Loop Design CO & CA (v2) _Final Signed, 3. Attachment 2 - NOE 19012 Calle Real Water Loop SIGNED, 4. Executed Agreement, 5. Minute Order

Title

Consider recommendations regarding the Calle Real Campus Main Water Loop Design Award of the Professional Services Agreement (PSA) for Construction Administration Services, Project No. 19012, Second District, as follows:

 

a) Approve and authorize the Chair to execute the PSA with Diversified Project Services International, Inc. (DPSI) to provide professional civil design, and construction administration services for the Calle Real Campus Main Water Loop Improvements and New Water Loop Design, located on the County’s Calle Real Campus in Santa Barbara, CA, in an amount not to exceed $29,490.00; and

 

b) Find that this contract is determined by your Board to be exempt from the provisions of the California Environmental Quality Act (CEQA) under State CEQA Guidelines Section 14 CCR 15302(c) because it consists of replacement or reconstruction of existing utility systems and/or structures where the new structure will be located on the same site as the structure replaced and will have substantially the same purpose and capacity as the structure replaced, and the Notice of Exemption on these bases was filed with the Board Letter on December 1, 2021.