Title:
|
Consider recommendations regarding an Agreement for Services of Independent Contractor (ASIC) for Inspector of Record for the Probation Headquarters Building Project; Project No. 19014.3, First District, as follows:
a) Approve and authorize the Chair to execute the ASIC with LG Inspection LLC, a California limited liability company (and a local vendor), in the base amount of $425,500.00, and a contingency amount of $46,275.00, for a total contract of $471,775.00, to provide Inspector of Record services during the construction, closeout, and post construction phases for the proposed Probation Headquarters Building, located at 1019 Garden Street, Santa Barbara, CA 93101 (APN 029-212-011);
b) Authorize the Director of General Services, or his Assistant Director or Capital Division Chief designee, to approve change orders under the ASIC in an aggregate amount not to exceed $46,275.00 in accordance with the provisions of the ASIC; and
c) Determine the above actions do not require chan...
|
Title
Consider recommendations regarding an Agreement for Services of Independent Contractor (ASIC) for Inspector of Record for the Probation Headquarters Building Project; Project No. 19014.3, First District, as follows:
a) Approve and authorize the Chair to execute the ASIC with LG Inspection LLC, a California limited liability company (and a local vendor), in the base amount of $425,500.00, and a contingency amount of $46,275.00, for a total contract of $471,775.00, to provide Inspector of Record services during the construction, closeout, and post construction phases for the proposed Probation Headquarters Building, located at 1019 Garden Street, Santa Barbara, CA 93101 (APN 029-212-011);
b) Authorize the Director of General Services, or his Assistant Director or Capital Division Chief designee, to approve change orders under the ASIC in an aggregate amount not to exceed $46,275.00 in accordance with the provisions of the ASIC; and
c) Determine the above actions do not require changes to the Final Mitigated Negative Declaration (SCH2023040126, GS-042022-19014-MND) for the Project, which was adopted by the Board in March 2024.
|