Title: Acting as the Board of Directors, Flood Control and Water Conservation District: Consider recommendations regarding the Temporary Assignment of Flood Control Easements for the Lower Mission Creek Flood Control Project, First and Second Districts, as follows: a) Approve and authorize the Public Works Director to execute the Temporary Assignment of Flood Control Easements for the construction of the Mason Street Bridge Project and adjacent elements of the Lower Mission Creek Flood Control Project (Project) for a period not to exceed 2 years from the date of execution; b) Direct staff to negotiate a Cost Sharing Agreement with the City of Santa Barbara for the construction of elements of Phases 1A-2 and 1B of the Project to be built concurrent with the Mason Street Bridge Project and return to the Board for execution; c) Direct staff to negotiate a Project Implementation Agreement with the City of Santa Barbara to address the respective needs of the City and County on future e...
Sponsors: PUBLIC WORKS DEPARTMENT, BOARD OF DIRECTORS, FLOOD CONTROL AND WATER CONSER
Attachments: 1. Board Letter, 2. Temporary Assignment of Permanent Easement Rights
Title
 
Acting as the Board of Directors, Flood Control and Water Conservation District:
 
Consider recommendations regarding the Temporary Assignment of Flood Control Easements for the Lower Mission Creek Flood Control Project, First and Second Districts, as follows:
 
a) Approve and authorize the Public Works Director to execute the Temporary Assignment of Flood Control Easements for the construction of the Mason Street Bridge Project and adjacent elements of the Lower Mission Creek Flood Control Project (Project) for a period not to exceed 2 years from the date of execution;
 
b) Direct staff to negotiate a Cost Sharing Agreement with the City of Santa Barbara for the construction of elements of Phases 1A-2 and 1B of the Project to be built concurrent with the Mason Street Bridge Project and return to the Board for execution;
 
c) Direct staff to negotiate a Project Implementation Agreement with the City of Santa Barbara to address the respective needs of the City and County on future elements of the Project and return to the Board for execution; and
 
d) Find that pursuant to the California Environmental Quality Act (CEQA) Guidelines section 15162, no substantial changes are proposed, there are no substantial changes in circumstances and no new information of substantial importance has come to light regarding environmental effects of the project or feasibility of mitigation measures and, therefore this action is within the scope of the project covered by the Environmental Impact Report/Environmental Impact Statement (EIR/EIS) for the Lower Mission Creek Flood Control Project as well as the Findings, and Statement of Overriding Considerations approved and adopted by the Board on May 10, 2011, and therefore, no subsequent environmental document is required.