File #: 16-00766    Version: 1
Type: Agenda Item Status: Passed
File created: In control: BOARD OF SUPERVISORS
On agenda: 10/4/2016 Final action: 10/4/2016
Title: Consider recommendations regarding the Lower Mission Creek Flood Control Project, Reach 2A, Second District, as follows: Acting as the Board of Directors, Flood Control and Water Conservation District: a) Authorize the Director of Public Works or designee to approve the Letter of Agreement (Folder: 3008-36) with Union Pacific Railroad (UPRR) for the construction of the portion of the Lower Mission Creek Project, Reach 2A, within an exclusive UPRR easement; and b) Find that pursuant to the California Environmental Quality Act Guidelines section 15162, no substantial changes are proposed, there are no substantial changes in circumstances and no new information of substantial importance has come to light regarding environmental effects of the project or feasibility of mitigation measures and, therefore this action is within the scope of the project covered by the Environmental Impact Report/Environmental Impact Statement for the Lower Mission Creek Flood Control Project as well as the...
Sponsors: PUBLIC WORKS DEPARTMENT, BOARD OF DIRECTORS, FLOOD CONTROL AND WATER CONSER
Attachments: 1. Board Letter, 2. Attachment A- UPPR Letter of Agreement

Title

 

Consider recommendations regarding the Lower Mission Creek Flood Control Project, Reach 2A, Second District, as follows:

 

Acting as the Board of Directors, Flood Control and Water Conservation District:

 

a) Authorize the Director of Public Works or designee to approve the Letter of Agreement (Folder:  3008-36) with Union Pacific Railroad (UPRR) for the construction of the portion of the Lower Mission Creek Project, Reach 2A, within an exclusive UPRR easement; and

 

b) Find that pursuant to the California Environmental Quality Act Guidelines section 15162, no substantial changes are proposed, there are no substantial changes in circumstances and no new information of substantial importance has come to light regarding environmental effects of the project or feasibility of mitigation measures and, therefore this action is within the scope of the project covered by the Environmental Impact Report/Environmental Impact Statement for the Lower Mission Creek Flood Control Project as well as the Findings, and Statement of Overriding Considerations approved and adopted by the Board on May 10, 2011, and therefore, no subsequent environmental document is required.