File #: 17-00524    Version: 1
Type: Agenda Item Status: Passed
File created: In control: BOARD OF SUPERVISORS
On agenda: 7/11/2017 Final action: 7/11/2017
Title: Consider recommendations regarding the Santa Maria Airport Ditch Improvement Project, Fourth District, as follows: Acting as the Board of Directors, Flood Control and Water Conservation District: a) Approve plans and specifications for the Santa Maria Airport Ditch Improvement Project; b) Award the construction contract for the Santa Maria Airport Ditch Improvement Project, in the amount of $1,112,684.00 to the lowest responsible bidder CalPortland Construction (a local vendor), subject to the provisions of documents and certifications, as set forth in the plans and specifications applicable to the project and as required by law; c) Approve and authorize the Chair to execute the construction contract upon return of the contractor's executed contract documents, and the review and approval of the County Counsel, Auditor-Controller, and Risk Manager or their authorized representatives; d) Approve and authorize the Public Works Director or designee to order the performance of itemiz...
Sponsors: PUBLIC WORKS DEPARTMENT, BOARD OF DIRECTORS, FLOOD CONTROL AND WATER CONSER
Attachments: 1. Board Letter, 2. Attach A - Plans OR8302, 3. Attach A - Specs OR8302, 4. Attach B - Construction Agr CalPortland, 5. Attach C- Agreement Filippin and Contract Summary

Title

 

Consider recommendations regarding the Santa Maria Airport Ditch Improvement Project, Fourth District, as follows:

 

Acting as the Board of Directors, Flood Control and Water Conservation District:

 

a) Approve plans and specifications for the Santa Maria Airport Ditch Improvement Project;

 

b) Award the construction contract for the Santa Maria Airport Ditch Improvement Project, in the amount of $1,112,684.00 to the lowest responsible bidder CalPortland Construction (a local vendor), subject to the provisions of documents and certifications, as set forth in the plans and specifications applicable to the project and as required by law;

 

c) Approve and authorize the Chair to execute the construction contract upon return of the contractor’s executed contract documents, and the review and approval of the County Counsel, Auditor-Controller, and Risk Manager or their authorized representatives;

 

d) Approve and authorize the Public Works Director or designee to order the performance of itemized supplemental work, as provided in the construction contract, in the amount not to exceed $10,000.00 for the Santa Maria Airport Ditch Improvement Project;

 

e) Approve and authorize the Public Works Director or designee to approve changes or additions to the work being performed under the construction contract, in an amount not to exceed $68,134.20 for the Santa Maria Airport Ditch Improvement Project;

 

f) Approve and authorize the Chair to execute the Agreement for Services of Independent Contractor with Filippin Engineering (a local vendor) to provide construction management and inspection services for the Santa Maria Airport Ditch Improvement Project, for the period of July 11, 2017 through December 31, 2018 in an amount not to exceed $144,690.00;

 

g) Authorize the Public Works Director or designee to approve amendments to the professional services agreement with Filippin Engineering in an amount not to exceed $14,469.00;

 

h) Determine that the Santa Maria Airport Improvement Project shall be carried out and determine that it is for the benefit of two or more zones hereinafter referred to as participating zones; and

 

i) Determine, pursuant to 14 CCR 15162, that Mitigated Negative Declaration No. 16NGD-00000-00014 was adopted for the Santa Maria Airport Ditch Improvement Project on March 14, 2017, that no substantial changes are proposed in the project, no substantial changes have occurred with respect to the circumstances under which the project is undertaken, and no new information of substantial importance has been received with respect to the project or the mitigation measures, and therefore no subsequent Environmental Impact Report or Negative Declaration is required for the approval of the recommended actions.